LASCO Activity Report for
September 22, 2005 SOHO Science Daily Meeting

Planner: K. Schenk, G. Stenborg

Event times are first frame seen in C2 camera unless otherwise noted.
These are preliminary observations for the daily SOHO science discussions.
Final analysis is reported on the Lasco CME list.
An archive of these reports is available.


Points Of Interest

SOHO KEYHOLE #10 telemetry period: Aug 31-Sep 28, 2005.

EIT CCD bakeout between Sep 2 23:00 UT - Sept 23 10:00 UT 
with its mini-cal pre and post sets as folows:
2005/09/02 19:00:00 - 2005/09/03 01:00:00
2005/09/23 20:00:00 - 2005/09/24 00:20:00

During the Telemetry Keyhole LASCO will be in improved synoptic cadence 
of C2 at 12 mins cadence and C3 at 30 mins cadence, including daily 
orange/blue filter fielding images.


2005/09/21 (Wednesday)

	  E Limb	Pseudo-continuous outflow all along the day.

	16:36 - 22:12 UT  	Temporary Data Gap.

22:12 UT  E Limb	Loop front already under development after data gap.

2005/09/22 (Thursday)

	00:12 - 06:48 UT	Temporary Data Gap.

Last C2 image available by the time of writing: 12:36 UT.


Web curator: K.M.Schenk
NASA Goddard Space Flight Center
Solar Physics Branch / Code 682
Greenbelt, MD 20771