- On 2005/03/11 @ 15:00 UT (Friday) SOHO changed to Submode 5. - 34 m Telemetry Keyhole began on 2005/03/10 (until 03/24). - 26 m Telemetry Keyhole began on 2005/03/02 (until 04/01). - Upcoming Maneuvers: The S/C roll back to 0 degrees is set for March 22. LASCO will be safing for the roll, and station keep maneuvers Monday March 21 at 20:00 UT closing doors. LASCO will open and resume ops Thursday March 24 15:00 UT. - During the keyhole LASCO will image at an improved cadence of C2 @ 12 minutes and C3 @30 minute cadences. This includes daily orange filter pB sequence and flat field orange/blue images. Using the keyhole recording scheme most all LASCO data will be recovered. - EIT CCD Bakeout: 2005/03/11 (Friday) - 2005/03/31 (Thursday). - Venus entered the C3 FOV from the right on 2005/02/26 (by the end of the day).
00:48 - 11:36 UT Temporary DSN Data Gap. W Limb Gusty outflow after the data gap all along the rest of the day. 17:48 UT S East Very faint ragged loop front in the gusty outflow that followed the 3-part structure CME event on previous day. Barely visible in C3.
00:48 UT W Limb Ragged and diffuse front preceded by a couple of not- well-defined fronts late on previous day. They all fade close to the inner edge of C3. By the time, the slow development of a system of loops can be seen superposed in the LOS. 07:12 UT W Limb Ragged front. 07:36 - 13:36 UT Temporary DSN Data Gap.