SOHO entered the Telemetry keyhole on 2004/09/11. It will last until 2004/10/06. LASCO is loaded with the 2 hr cadence in C2 and C3 pB orange filter binned full field (FOV) LEB summed. This will be part of the CME Watch in LASCO pB program to run the duration of this keyhole. This kicked off 9/10 22:30 UT and continues through 10/3 12:00 UT. EIT 195 CME was interrupted on 2004/09/10 (Friday) at 20:00 UT for EIT CCD bakeout calibrations. EIT CCD bakeout between 2004/09/10 @ 22:00 UT - 2004/10/03 (Sunday) @ ~22:00 UT.
01:36 UT S East Ragged and not well defined faint loop front that fades throughout C3. 02:12 UT E Limb Very faint loop front. It fades throughout C2. 08:12 UT E Limb Another very faint loop front slowly developing. 09:12 UT S East Faint and elongated diffuse loop front. It fades throughout C3. It is followed at 19:12 UT by a ragged asymmetric front. 14:12 UT WN West Ragged front that quickly fades. 19:36 UT W Limb Diffuse loop front that quickly fades followed at 20:57 UT by a another one that also quickly fades.
03:12 UT SS East Extremely faint ragged front. 03:36 UT N East Faint elongated expanding loop front. 10:12 - 13:24 UT Temporary DSN Data Gap